21 Fitzsimmons Apartment Homes
Exterior Repaint with Full Color Transformation. Luxury Multifamily Apartment Community.
Property Details
Park Pacific Tower is a high-rise senior living community located in the heart of Long Beach. The property required multiple exterior improvements to extend the life of the building envelope while maintaining a safe and comfortable environment for residents. ECC was selected to perform several major scopes of work simultaneously while the building remained fully occupied.
The project required extensive exterior upgrades on a fully occupied senior residential tower, which created several logistical challenges:
Managing safety, communication, and coordination between trades was critical to ensuring the project stayed on schedule and residents remained comfortable throughout construction.
ECC implemented a phased construction approach that allowed multiple scopes of work to be completed efficiently while maintaining resident safety and building operations. The project included three primary scopes:
Existing sliding glass doors were removed and replaced with new systems designed to improve performance and durability. As part of the installation, ECC added sill pans to enhance water management and protect the building envelope.
Balconies throughout the property were waterproofed to prevent water intrusion and extend the life of the exterior structure.
Following the restoration work, ECC began repainting the exterior of the building to provide a refreshed appearance and long-term protection from coastal weather conditions.
All work was performed using swing stages to safely access the building’s façade.
Because the building remained occupied, ECC maintained close communication with property management and residents throughout the project. Careful scheduling and coordination with the electrical contractor ensured that construction activities did not interfere with the replacement of the building’s main electrical infrastructure.
The project successfully improved the performance and appearance of the building while minimizing disruption to residents.
Through careful planning, trade coordination, and specialized access methods, ECC completed complex exterior improvements on a fully occupied high-rise community.
The result was a successful project for the client, property management team, and residents of Park Pacific Tower.